Inference rack — phase 1

State ≠ Done Assignee: me Cycle: Phase 1 showing 18 of 18
Gantt · 26 Oct – 24 Novblocked items shaded
Work itemState
Oct 2026
Nov 2026
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
▾ A · Power & electrical
A1Site power audit + load calcClosed
A2240 V breaker + circuit runIn progress
A3Rack, PDU + cable managementBlocked
▾ B · Network
B1Order fibre uplink (business)Closed
B2Firewall rules + VLAN splitReady
▾ C · Cooling & room
C1Cooling design (airflow, dB)In progress
C2Ducting + intake installBlocked
▾ D · Paperwork
D1Insurance rider + LLC docsIn progress
D2Provider contract reviewBlocked
▾ E · Node bring-up
E1GPU node burn-in (3× 24 h soak)Blocked
E2Benchmarks + listing photosBlocked
▾ F · Sell capacity
F1Marketplace listing applicationBlocked
F2First paid workload liveBlocked
today
240 V breaker + circuit run
Cooling design
Insurance rider + LLC docs
GPU node burn-in
First paid workload live
RACK-24

Rack, PDU + cable management

Blocked · 10 Nov → 11 Nov · 2 points
Assigneeyou
CyclePhase 1
PriorityHigh
Relations
blocked byRACK-22 240 V breaker
blocked byNET-3 Firewall rules
blockingGPU node burn-in
Plane models these as blocking links between work items. The Gantt draws bars against dates you set — it does not recompute them from the links.
Saved views
My open items6
Blocked7
Due this cycle11
Views filter and group; none is a dependency-ordered “do this next” list.